Process & approval
Packing & delivery
Plan the crate, the route and the handover together.
Define the delivery scope.
- 01
Confirm package size and weight.
- 02
Review the route and unloading.
- 03
Agree the handover scope.
- 04
Record the arrival condition.
Keep the agreed information with the dated project drawing.
Define the delivery scope.
Write down the destination and exactly what the price includes: transport, unloading, movement inside, assembly and installation. Identify the party responsible for each stage.
- Check the route with packed dimensions.
- Keep a numbered packing record.
- Agree the arrival procedure.
The detail behind the decision.


Check the route with packed dimensions.
The finished piece and its crate have different sizes and weights. Ask for the packing information, then review doors, lifts, stairs, parking and any lifting arrangements with the delivery team.
Keep a numbered packing record.
Request images of the protected parts, the crate and its markings, together with a packing list. Confirm which accessories, fittings and drawings travel with each piece.
Agree the arrival procedure.
Arrange a safe place for unloading and inspection. Photograph the crate and condition on arrival, record any concerns with the carrier and follow the agreed reporting process. Do not attempt to move heavy stone without the suitable team and equipment.
A useful record to request.
- Project and piece reference, with date and drawing revision.
- Named material, finish and approved layout.
- Checks agreed with the responsible team and the evidence supplied.
- Open points, approval status and the person confirming the next stage.
Bring a reference. We will help clarify the brief.
Image sources
Image sources
Images illustrate design and material choices. They are not a record of an AxoStone installation.
- Image 1: Original source
- Image 2: Original source
- Image 3: Original source